Sun Microsystems 806-2997-10 Guia De Instalacion página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
4. Attach the two connector clusters to the power input panel.
Attaching Connector Clusters to the Power input Panel
FIGURE 1-2
Mount the lower cable harness cluster (B) on the right side of the input panel.
Position each cluster under the power input panel with the open side up. (The cables
are positioned on the left side of the power input panel.) The connectors engage with
the slots in the front surface. Secure each cluster with a single screw between the two
connectors.
While attaching the left-hand cluster (A) to the power input panel, ensure that the
cluster supports the two cables from the right-hand cluster (B).
1-4
Power Distribution System Installation Guide • November 2002

Publicidad

Tabla de contenido
loading

Productos relacionados para Sun Microsystems 806-2997-10

Tabla de contenido