2. Holding the carrier plate, pass the cable bundle through the space between the
outer frame and the rack mounting rail.
Cable Harness and Carrier Plate
FIGURE 1-1
After the cable ends are inserted, insert the carrier plate and push it forward
towards the front of the rack. As you slide the carrier plate in, the front end is
guided by a vertical channel on the front cover plate.
As the carrier is close to being fully inserted, a small tab on its bottom edge aligns
with a slot in the channel to position the carrier to the right. As this tab fully engages
a small vertical slot in the carrier plate engages and allows the carrier to drop into its
final position. At this point tighten the captive screw.
3. Repeat Step 2 for the upper cable harness (A).
Chapter 1 Installing a Power Distribution System
1-3