Technical Data; Commissioning The Device; Operations Prior To Installation - Madas MTC10 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.0 - TECHNICAL DATA

• Ambient temperature
• Supply voltage
• Power supply tolerance
• Electric wiring
• Absorbed power
• Output for operation
• Output for fault
• Fuse
• Test cycle
• Protection rating
• In compliance with
* Only single-phase, the device does not work if powered with three-phase voltage.

3.0 - COMMISSIONING THE DEVICE

3.1 - OPERATIONS PRIOR TO INSTALLATION

• Before start-up, make sure that all the instructions on the rating plate are observed;
• Cut off power prior to proceeding with wiring;
• Provide a protection against impacts or accidental contacts if the device is accessible to unqualified personnel.
3.2 - GENERIC EXAMPLE OF AN INSTALLATION
(Burner Ramp)
1. FM gas filter
2. OPSO series MVB/1 MAX shut off valve
3. RG/2MC pressure regulator
4. Minimum pressure switch
5. EVPC/NC automatic solenoid valve with fast opening
6. Maximum pressure switch
7.
EVPCS/NC automatic solenoid valve with slow opening
3.3 - INSTALLATION IN PLACES WHERE THERE IS THE RISK OF EXPLOSION (DIRECTIVE 2014/34/EU)
The device is not suitable for use in potentially explosive areas.
Madas Technical Manual - 9|9.4 - REV. 0 of 8
: -20 ÷ +60°C
: 110 V/50-60 Hz - 230 V/50-60 Hz*
: -15% ... +10%
: cable gland PG9
: 3.2 VA (only of the device)
: 2 A
: 1 A
: 6.3 A delayed
: approx. 60 s
: IP65
: EN 1643:2000
Directive EMC 2014/30/EU - Directive LVD 2014/35/EU
13
1
2
3
Feb 2019
th
8. External reset
9. Burner control
10. MTC10 leak test device
11. MVS/1 relief valve
12. Pressure gauge and relative button
13. Gas detector
discharge in open air
11
12
5
4
17
Power
9
10
8
7
6
MTC10

Publicidad

Tabla de contenido
loading

Tabla de contenido