Kohler K-705700 Guia De Instalacion página 13

Ocultar thumbs Ver también para K-705700:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Threshold
8. Install the Strike Jamb - 30" (76.2 cm) - 48" (121.9 cm) Models
Position the strike jamb on the opposite wall, tight to the inside edge of the bottom track, resting
directly on the threshold.
Use a level to align the strike jamb vertically.
Temporarily secure the strike jamb to the wall with masking tape.
Mark the hole locations with a pencil.
Remove the strike jamb and set aside.
NOTE: When the installation is on ceramic tile, use the center punch to nick the surface glaze or drill a
very small pilot hole. Tap the punch lightly with the hammer to avoid cracking the ceramic tile.
Lightly center punch the hole locations or drill very small pilot holes.
NOTE: Start drilling slowly to prevent damage.
Use a 9/64" bit to drill a hole at each of the marks.
Thoroughly clean the shower ledge.
Attach the strike jamb to the wall with the supplied #8-18 x 1-1/2" screws.
Insert the strike jamb cap into the strike jamb from the top.
Insert the bulb seal into the strike jamb from the top.
Kohler Co.
Strike Jamb
Screw
Anchor
Strike
Jamb
Strike
Jamb
Cap
Strike
Jamb
Cap
13
Strike Jamb
Bulb Seal
Strike Jamb
1064866-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido