Edge of receptor should sit flat on
floor. Shim as required.
4. Prepare the Receptor
Assemble and install the drain according to the manufacturer's instructions.
Move the shower receptor into the framing pocket.
Make sure the unit is level on all sides. If the unit is not level, shim as required to level the unit.
Predrill the side and back nail-in flanges on the stud centers around the receptor. Do not nail the
receptor in place at this time.
Kohler Co.
Receptor
Back View of Receptor On A Subfloor
Install the receptor with the
drain fitting attached
Check level here
Leveling blocks/shims should be
placed under the receptor if needed
5
Subfloor
1024937-2-C