Do not connect the machine to the mains electricity supply by a multi-socket adapter or an
extension lead.
All installation works must strictly comply with current local and national safety regulations.
On the inferior back part of the machine, the symbol
equipotential connection with other equipments.
Connect the power cable to the electricity supply.
5. Operating Instructions
Never operate the machine with wet hands!
Danger of burning and scalding! The liquids and steam are very hot! Do not approximate your
face and hands to the zone above the steam wands.
Do not touch the groups, the metal parts of the porta-filter and the steam wands because
they are very hot!
5.1.
Getting Started
1.
Press the main switch in order to turn the machine on. A green signal lamp lights up during the
water filling. When the water in the boiler reaches the predefined level, the green signal lamp
automatically switches off.
When installing the machine for the first time or after a complete emptying of the boiler,
only switch on the heating after the green signal light has been switched off. Once the boiler has been
filled with water, you may press the two switches at the same time.
2.
When the green signal lamp switches off, switch on the heating in order to start the heating of
the boiler water. During the water heating, an orange signal lamp lights up. When the water
temperature reaches the predefined level, the orange signal lamp switches off.
3.
Check the manometer. When the orange signal lamp switches off, the boiler pressure must be
at ca. +/-1 bar (+/- 0,1 Mpa). The manometer of the pump must show the system pressure.
4.
Before using the steam wand, clean it letting steam flow out for a few seconds. The hot steam
cleans the wand. Turn the wand off.
5.
Now you can begin to make coffee.
5.2.
Programming the portion keys (CV Models)
The automatic models (CV models) allow the programming of each drink portion.
1.
Place the desired amount of coffee in a filterholder and insert it into the group.
2.
Press the programming key (key 5) and keep it pressed for 3 seconds. The LED of key 4 starts to
blink. All LEDs of the keyboard light up, indicating that the keyboard can now be programmed.
3.
Within 5 seconds, press the portion key you wish to program. The LED of the key and the LED of
key 5 stay lit while all other LEDs turn off.
4.
When the desired amount of coffee has been produced, press key 5 in order to stop the
production. The LED of the activated portion key turns off. Key 5 starts to blink and all other LEDs light
up.
5.
Repeat steps 1-4 for all other portion keys.
If no key is activated for more than 20 seconds during the programming process, TIME OUT
occurs and the machine automatically exits the programming mode.
5.3.
Prepare espresso coffee
AUTOMATIC MODELS (CV Models)
Prepare coffee with automatic portioning
1.
Fill a filterholder with the correct dose of
freshly ground coffee (6.5-7 g per espresso coffee).
2.
Press the ground coffee uniformly with an
espresso tamper in order to distribute the ground
coffee evenly into the porta-filter.
SEMI-AUTOMATIC MODELS
Espresso Coffee Machine Marina by fiamma – Operating Manual
ENGLISH
indicates a terminal for the
19