Setup And Unit Operation 4, 5 - Oki HCT-1000 Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

All manuals and user guides at all-guides.com
Figure 5 HCT-HV1 Hand-piece Assembly
Figure 6 HCTA-TH1
4. Setup and unit operation
1. Basic unit setup
1.
Connect the hand-piece assembly, HCT-HV1, to the power supply.
2.
Plug the power cord into the power connector (Figure 2). Plug the power cord
into a grounded wall socket of the rated input line voltage.
3.
Connect the dual footswitch, HCT-FS2, to the unit (Figure 2).
4.
Turn On the unit by pressing the Power button  momentarily.
5.
To Abort a Profile (to the Cool-Down zone*) press and hold the  (red) on the
footswitch or  (red) on the hand-piece down while in Run Mode.
6.
*Note: Depressing the  (red) on the footswitch or  (red) on the hand-piece
a second time will decrease the cool down time to a minimum of 60 seconds.
7.
Turn Off the unit by pressing the Power button  momentarily. Note ~ you
must be out of set-up mode in order to do this. I.e. no flashing numbers on the
display.
2. System Mode Selection
The HCT-1000 has two system modes of operation.
The first mode is HCT. In this mode, the HCT-1000 is used as a standalone
handheld convection rework tool.
The second mode is MRS. In this mode, the HCT-1000 is used as part of a
Modular Rework System. The unit is connected via cable to a PCT-1000 and
may be used with the ATH-1000 Adjustable Tool Holder. In this mode the
HCT-1000 provides timing control for both units and the ATH-1000 allows
repeatable place and remove operations.
Plug the Communications Cable into the Communication Connector (Figure 2
above) on the HCT-1000 and the PCT-1000. When connected in MRS mode
the time setting on the PCT-1000 will display "- -".
Vacuum Pick-up Tube
Adjustment
 (blue) Vacuum Activation
 (red) Profile Start/Abort
Heater Assembly
Vacuum Pick-up Tube
Figure 7
4

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido