72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
8" (20.3 cm)
4" (10.2 cm)
Bath/Shower Installation
72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
48" (122 cm) to Floor
Shower Installation
1. Begin Installation - Floor Supplies
CAUTION: Risk of product damage. Remove the plaster guards,
valve units, and aspirator before applying heat to the yoke.
Determine the location of the support framing for the yoke,
spout, and the showerhead.
Install the support framing.
The yoke has two union joints that can be used with either 1/2"
pipe or copper tubing.
Connect the hot and cold supplies to the union joints. They
should be 2-1/4" (5.7 cm) minimum and 3" (7.6 cm) maximum
from the finished wall.
Reinstall the plaster guards, valve units, and aspirator that were
removed before soldering.
Kohler Co.
2-1/4" (5.7 cm)
Min
3" (7.6 cm)
Max
Yoke
Union
Joints
1/2" Pipe or
Copper Tubing
3
Finished
Wall
Plaster
Guard
Valve Units
117061-2-A