Broan Elite E12000 Serie Manual Del Usuario página 7

Ocultar thumbs Ver también para Elite E12000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
The hood must be installed inside a
cabinet.
For the cabinet measurements, refer to
Figure 4.
Installation directly to cabinet
Refer to Figure 5.
1. Make the 4 necessary mounting holes
in the cabinet and cut the air venting
and power cord holes.
2. Move the hood close to the bottom of
the cabinet and then secure the unit
by means of the 4 self-tapping screws
(4.2 x 32 mm) supplied.
Installation to the cabinet with
brackets
Refer to Figure 6.
1. Take the two brackets out of the
accessory bag together with the 4
screws provided (4.2 x 15mm).
2. Fit the brackets (S) to the cabinet
being careful to position these
correctly.
3. Adjust the angle of the hood with
the 4 leveling screws (3.9 x 9.5 mm)
4. Fasten the hood to the brackets
using the 2 screws (M4 x 8 mm)
and 2 washers.
FIGURE 6
2-3/16"
3-1/8"
MOUNTING SCREWS
(4.2
15
X
MM
MOUNTING SCREWS
(M4
8
)
X
MM
7-1/2"
)
FIGURE 4
12-3/16"
FIGURE 5
8-9/16"
22-1/16"
S
- 7 -
22-1/16"
MOUNTING SCREWS
(4.2 x 32 mm)
17-11/16"
12"
MIN.
12-3/16"
LEVELING SCREWS
(3.9
9.5
)
X
MM

Publicidad

Tabla de contenido
loading

Tabla de contenido