Installation; Physical Installation; Typical Installation - red lion RLSP33PED El Manual Del Propietario

Bomba de pedestal en termoplástico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Physical Installation

Risk of severe injury or death by electrical shock.
Always disconnect the electrical power before touching the pump or discharge.
Check local electrical and building codes before installation. The installation must be in accordance
with their regulations as well as the most recent National Electrical Code (NEC).

Typical Installation

1.
Rubber Stoppers
2. 5.5" (140 mm) Maximum
3. Float Stem
4. Float Stem Guide
5. Float
6. Pump Base / Volute
Discharge
7.
Pump Column
8. Discharge Pipe
9. Check Valve
10. Sump Pit Cover
(optional)
11. Ball or Gate Valve
12. Pump ON Level:
8-10" (203-254 mm)
13. Pump OFF Level:
3-5" (76-127 mm)
14. 8.5" (215 mm) Maximum
Basin Dimensions:
15. Basin Height
24" (610 mm) Maximum
18" (457 mm) Minimum
16. Basin Diameter:
13" (330 mm) Minimum
14
15
4
12
13
1
2
3
5
16
INSTALLATION
Physical Installation
11
9
8
10
7
6
5

Publicidad

Tabla de contenido
loading

Tabla de contenido