Kohler Sterling 6065 Manual Del Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Wall Jamb
Inside of
Bath
Outside
of Bath
Bottom Track
5. Install the Storage Column
Position the bottom frame piece of the storage column over the bottom track assembly.
Slide the storage column into place in the chosen wall jamb.
Position the storage column so the shelves will be level.
NOTE: The self drilling screws will create their own hole. No pilot hole is needed.
Position a #8 x 3/8" self drilling screw in each slot with the tip positioned in the groove in the
storage column frame and tighten.
6. Install the Center Jamb
Determine which end of the center jamb is shaped to fit over the bottom track.
Place the center jamb on the bottom track with the shaped side down and the slots to the inside of
the bath.
NOTE: The self drilling screws will create their own hole. No pilot hole is needed.
Secure the center jamb in place with three #8 x 3/8" self drilling screws.
1035946-2-C
#8 x 3/8"
Self-Drilling
Storage
Screw
Column
Screw
Bottom Track
8
Inside of
Shower
Center
Jamb
Outside
of Bath
Inside of Bath
Slot
Shaped End of
Center Jamb
Side View
Wall Jamb
Sterling

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Sterling 6075

Tabla de contenido