Preparation; Initial Installation - Harbor Breeze PEH44BCW5MC Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION

1. Before beginning assembly, installation or operation of product, make sure all parts are
present. Compare parts with package contents list and diagram above. If any part is missing or
damaged, do not attempt to assemble, install or operate the product.
Estimated Assembly Time: 120 minutes
Tools Required for Assembly (not included):
electrical
tape
Helpful Tools (not included):
A/C tester
light
Bulbs Required (included):
3 candelabra base
40 watt max. bulbs
DANGER: When using an existing outlet box, make sure the outlet box is securely
attached to the building structure and can support the full weight of the fan. Failure to do this can
result in serious injury or death. The stability of the outlet box is essential in minimizing wobble
and noise in the fan after installation is complete.
CAUTION: Be sure outlet box is properly grounded and that a ground (green or bare) wire
is present.
2. After opening top of carton, remove mounting hardware package from foam inserts. Remove
motor from packing and place on carpet or on foam to avoid damage to finish.
CAUTION: Carefully check all screws, bolts and nuts on fan motor assembly to ensure that
they are secured.

INITIAL INSTALLATION

1. Turn off circuit breakers and wall switch to the fan supply
line leads. (Fig. 1)
DANGER:
Failure to disconnect power supply prior
to installation may result in serious injury or death.
2. Check to make sure blades (H) will be at least 30 in. from
any obstruction and at least 7 ft. above the floor. (Fig. 2)
Phillips
screwdriver
tape
do-it-yourself wiring handbook
measure
(available at Lowe's)
A-15
pliers
safety
glasses
6
stepladder
wire
strippers
wire cutters
Fig. 1
H
Fig. 2
30 in.
min.
7 ft.
min.

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

0312115

Tabla de contenido