SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación página 22

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5 Installation
Figure 8:
Ensure adequate air fow
Figure 9:
Mount on non-fammable surface
Figure 10: Mount upright on vertical surface A backward
tilt of ten degrees is allowed.
Figure 11: Avoid dust and ammonia gases
INFORMATION
When selecting the installation site, ensure that
the product and warning messages on the
inverter are visible at all times. For details, refer
to Section 9, page 44.
INFORMATION
For information about the operating
temperature range, see Section 9.3, page 46.
INFORMATION
The safety clearances to other objects must be
maintained to ensure sufcient air circulation
(see (see Section 5.3, page 23)).
22
SHP75-10-STP60-10-IA-xx-19
SMA Solar Technology AG
Installation Guide

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60Shp 75-10Stp 60-10

Tabla de contenido