Cleco NeoTek 30EA Serie Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
General Safety Instructions: Controller
→ Turn off the controller before connecting power or
tool cables, during changeover, cleaning, and taking
out of operation.
→ Do not modify the controller, protective devices, or
accessories without prior written authorization from
Apex Tool Group LLC.
→ Do not open the controller or the components of
the controller. Any interference can cause an error
resulting in serious injury from electrical shock.
→ Opening the controller will void the manufacturer's
warranty.
→ Send the controller for service and maintenance to
an authorized Cleco Sales and Service Center.
1
Designated use
This product is part of the Cleco tightening system and
is intended exclusively for industrial use in fastening
processes.
Use the controller only under the following conditions:
In conjunction with the components listed in the EC
Declaration of Conformity P3268C.
With the permissible supply voltage.
In EMC Limit Class A (electromagnetic immunity for
industrial areas). For the currently observed EMC
standards, see the EC Declaration of Conformity.
Do not use the controller:
In potentially explosive areas.
In damp areas or outdoors.
2
Ambient conditions
→ Keep the controller away from heat, fire, risk of
explosion, and moisture.
Function
Temperature
Transport /
-4°F to +158°F
Storage
(-20°C to +70°C)
+32°F to +113°F
Operating
(0°C to +45°C)
3
Power supply
→ Operate only on a grounded power supply (TN
system). Operation on an IT system is not permitted.
Nutrunner
Input Voltage,
Control
Single Phase
mPro400GCD-P
100-240 VAC (± 10%)
4
Installation
Risk of crushing. The controller could fall causing
personnel injury.
→ Use suitable lifting equipment during installation.
Relative
Working
Humidity
Height
up to 9800 ft.
0...90%
(3000 m)
non-condensing
above sea level
Input
Frequency
Current
16 A max.
50-60 Hz
1-2 A
EN
→ Observe facility safety requirements during
installation of the controller.
→ Use approved mounting hardware for the controller:
4xM6 properly tightened to prevent loosening (see
hardware description P2300HW).
→ Install all tool and power cables so that they are not
damaged and do not present a trip hazard.
→ Do not exceed a total cable length of 45 m (147.6 ft.).
In case of failure, high voltage leakage may occur and
cause injuries as mentioned previously.
→ Use the Cleco recommended regional power cable
when connecting the controller to the power source.
Do not, in any way, modify the Cleco supplied power
cord.
→ Potential charge on assembled products and
conveyance systems needs to be recognized and
managed to prevent operator injury.
→ Before energizing the controller, ensure that all
connections have been properly made (see
Hardware Description P2300HW).
4
Before initial operation
→ Before initial operation perform PE measurement
according to locally applicable regulations (for
example: DGUV Vorschrift 3 in Germany).
→ Observe the safety notes on the controller and the
tool.
→ Check the controller, tool, and cable for any obvious
defects.
→ Replace damaged cables immediately.
5
Operation
→ Immediately shut off the controller in the case of
unusual noise or vibration from the tool. Disconnect
the power supply and have qualified personnel
check the tightening system.
Page 7
TM12-1109-LG1
08/25/2017

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Neotek 50ea serie

Tabla de contenido