Product Description; Before Initial Operation - Cleco NeoTek 30EA Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
TM12-1109-LG1
08/25/2017
2
Items supplied, transport/storage:
Items supplied
Inspect the product for shipment damage and ensure that all
items have been received:
Correct product
Instruction manual
Declaration of conformity
Transport / Storage
Transport or store in the original packaging. Disconnect the
power supply during storage. The packaging is recyclable.
Refer to the Ambient Conditions contained in the safety
instructions.
3

Product description:

Corded Nutrunners
Quarter turn tool cable connection
Configurable LED light rings
Clockwise/counterclockwise rotation
Fastening parameters are set by the controller.
CW / CCW indicator lights
7
6
Corded Nutrunners
Ref.
1
Tool cable connection
2
Two-position start switch
3
Configurable multi-function buttons
4
Configurable LED light rings
5
Motor assembly
6
Gearing
7
Attachment
LED Light Ring Display
LED Light
Blue
Green
Red
Yellow
5
4
3
2
Description
Description
User defined
OK rundown
NOK rundown
Status
EN
4

Before initial operation:

Power supply
Power for the nutrunner is provided by networking it with a
tool controller.
Cable connection to the tool
1.
Make sure that the green mark on the tool cable is
visible. If necessary, twist the sleeve counterclockwise.
Green Mark
2.
Insert the tool cable into the nutrunner handle.
3.
Align the arrow mark on the tool cable with the mark on
the tool handle.
4.
Hand tighten the sleeve 1/4 turn.
1
Cable connection to the controller
1.
Turn the tool cable so that Open is on top of the ring.
2.
Insert the tool cable into the X24 connector of the
controller.
3.
Align the Open mark on the tool cable with the arrow on
the connector.
4.
Hand tighten the ring 1/4 turn.
Page 10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Neotek 50ea serie

Tabla de contenido