Kohler Sterling SP1500D Serie Guia De Instalacion página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Seal the Bottom Track
Apply silicone
sealant here.
Bottom Track
6. Caulk and Install the Bottom Track
Remove the bottom track.
Apply silicone sealant to the underside of the bottom track, as shown.
Make sure the ledge is clean and install the bottom track at the location marked on the shower
ledge.
Use masking tape to hold the bottom track in place.
IMPORTANT! Illustration shows a left side pivot. Reverse the pivot bushing and plastic plug for a right
side pivot.
Insert the plastic plug into the hole on the strike side of the bottom track.
Insert the pivot bushing into the hole on the pivot side of the bottom track.
Sterling
Underside of
Bottom Track
Install the Bottom Track
Plastic Plug
Pivot Bushing
Pivot Side
9
Strike Side
Masking Tape
1034026-2-D

Publicidad

Tabla de contenido
loading

Tabla de contenido