Preliminary Checks; Installing The Product - Key Automation Marantec COMFORT TU Instrucciones De Instalacion Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22

3 - PRELIMINARY CHECKS

Before installing this product, verify and check the following steps:
- Check that the gate or door are suitable for automation
- The weight and size of the gate be within the maximum permissible
operating limits specified in Paraghaph 2.2
- Check the presence and strength of the security mechanical stops
of the gate
- Check that the mounting
area of the product is not subject to flood-
ing
- Conditions of high acidity or salinity or proximity to heat sources
could cause malfunction of the product
- Extreme weather conditions (for example the presence of snow,
ice, high temperature range, high temperatures) may increase the
friction and therefore the force required for the handling and initial
starting point may be higher than under normal conditions.

4 - INSTALLING THE PRODUCT

4.1 - Installation
ATTENTION !
The installer must verify that the working temperature range
stated on the automation device is suitable for the location
where it is installed.
ATTENTION !
The automation system must be equipped with a pressure-sen-
sitive edge protecting all possible crushing points (hands, feet,
etc.) in accordance with the requirements of the EN 13241-1
standard.
ATTENTION !
The gate has to be equipped with stop locks at the opening and
closing, which prevent the gate derailment.
- Check that the manual operation of gate is smooth and friction-free
and there is no risk of derailment of the same
- Check that the gate is in mechanical equilibrium and stationary if
left in any position
- Check that the power line to supply the product is equipped with
proper grounding safety and protected by a magnetothermal and dif-
ferential security device
- Provide the power system with a disconnecting device with a gap
of contacts enabling full disconnection under the conditions dictated
by the overvoltage category III.
- Ensure that all materials used for the installation comply with cur-
rent regulations
Respecting the overall size, fix to ground the base-plate through
4 sturdy screw-anchors (fig.3) or drown it into the concrete (fig.3).
Plan for one or more sheathing for the passage of the power lines.
N.B. The exact dimensions of the rack must be known to allow pre-
cise calculation of the counterplate position.
Fig.2 is an example of a typical system:
Post for photocells (1)
Automation electromechanical (2)
Photocell detectors (3)
Flashing light (4)
Key switch (5)
Radio transmitter (6)
Pressure-sensitive edge (7)
EN
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tu500Tu800

Tabla de contenido