Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Step 1
Connect the bottom tube with the
base by screwing them together.
Step 3
Screw the middle tubes with the
bottom tube.
13

Assembly

Feed the power cord through the base
and the bottom tube, and pull through
around 2m of cable
Place the power cord plug through
base, bottom pole, middle pole and top
pole. Connect the power cord plug to
the socket in the heater head.
Step 2
Step 4

Publicidad

Tabla de contenido
loading

Tabla de contenido