Grundfos Conex DIA-1 Instrucciones De Instalación Y Funcionamiento página 22

Ocultar thumbs Ver también para Conex DIA-1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 100
M B/R
G/C
Pt 100
1
2
7
6
8
9
10
Sensor interface
4/
1/
1/
4/
3/
3/
A
11
13
1
3
1
3
4/
1/
1/
4/
3/
3/
12
14
2
4
2
4
Fig. 21
Connection to measuring cell
AQC-D13
B/R G/C
M
1/11 1/13
1/12 1/14
15
Fig. 22
Connection to measuring cells PAA
(peracetic acid) / HP (peroxide)
+ -
Fig. 23
Connection to single-rod measuring
chains for pH, redox
22
2
1
11
12
Conex
2/
2/
COM
3
4
-
+
11
NC
B
12
A
4/1
4/3
3/1
3/3
4/2
4/4
3/2
3/4
B
14
1
2
1/1 1/2
-
+
7
13
Pos.
Description
1
Brown
2
White
3
Black
4
Blue
5
Screen
6
Outer conductor (screen)
7
Inner conductor
8
Reference electrode
9
Measuring electrode
10
Counter electrode
11
Pt100 temperature sensor
12
Water sensor
13
Outer conductor
14
Yellow
15
Green
Peculiarities for the connection at the control
panel enclosure of Conex
1. First connect the measuring cells, the single-rod
measuring chains and the sensors to the sensor
interface.
2. Secondly, connect the sensor interface to the
®
Conex
DIA-1.
®
DIA-1

Publicidad

Tabla de contenido
loading

Tabla de contenido