Cequent Performance Products 76023 Instrucciones De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Bumper beam and exhaust hanger removal – use 15mm socket to remove (2)
flange nuts and (2) M10 bolts from bumper beam each side. Gently remove the
bumper beam and exhaust hanger. Use a stand to support exhaust and prevent it from
damaging.
5. Tighten all fasteners with torque wrench to 53 Lb.-Ft. (72 N*M).
Proper torque is needed to keep the hitch secure to the vehicle when towing.
6. Reinstall all fasteners, straps, mud flaps, and fascia removed in Step 1,2.
7. Fascia door can be trimmed 1.5'' tall by 3.0'' wide and reinstalled as shown in Figure 5. Get
customer approval before trimming the fascia door
©2016 Cequent™ Performance Products, Inc. - Printed in Mexico
4. Hitch installation – raise the hitch and hang it on the studs on the bumper end
panel. Raise the bumper beam and exhaust hanger bracket to sandwich the hitch, see
Figure 1. Reuse the bumper fasteners and loosely fasten them.
1.5''
Sheet 5 of 15
76023NP
3.0''
07-07-16
Rev. A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

84023Cqt76023

Tabla de contenido