14. Position sealing boot.
Thread the three phases and ground wire(s) through the sealing boot. The
phases go through the large holes; grounds go through the small holes.
Slide the boot over the cable jacket (or jacket shim) as far as it will go.
Insert the plugs into any unused ground holes. Hang the plugs by locks as
shown.
15. Shrink boot in place.
Begin shrinking boot fingers. Shrink down over body onto cable jacket.
16. Outdoor modification is complete.
*Refer to 1/C HVT instructions to complete the 3/C termination. Treat
rejacketing tube as each phases' cable jacket.
PII-53163, Rev AE
DCR C27625, PCN 369999-000
Effective Date: November 20, 1995
Installation Instructions
Plug
6
© 1995 Raychem Corporation
Printed USA 11/20/95
Sealing Boot
623
600
601