ABB EOHU Serie Boletín De Instrucciones página 26

Ocultar thumbs Ver también para EOHU Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Maintenance
Installation and maintenance log
Maintenance
1
The switch is properly lubricated at the factory. No lubrication
is required. However, careful cleaning is required after
wire connections and mounting of additional accessories
and replacement parts. The cleaning and checking of wire
connections are recommended to be performed once a year.
Installation and maintenance log
All service performed on this device should be recorded in the Installation and Maintenance Log.
Date of installation of the safety switch:
Description of service performed
1/22 Maintenance | Instruction Bulletin EOHU367/8J/R/S/SS, 1SCC340040M1401 / A
Reason for servicing
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
See general safety instructions on page 1/2 before proceeding.
Failure to follow these instructions will result in death or serious injury.
Special observations of device
Date of service
Name of person
performing service

Publicidad

Tabla de contenido
loading

Tabla de contenido