Installation - ProBreeze PB-AC01 Manual De Instrucciones

Ocultar thumbs Ver también para PB-AC01:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation

Prior to and after installation adhere to
the below:
When moving the appliance to the chosen
location ensure it is kept in an upright position.
Do not place or use the appliance, power cord,
or any accessories in a bathroom, wet, or damp
place.
Place the appliance on a flat and dry surface.
Keep it at least 50cm away from surrounding
walls and/or objects.
Leave the appliance in an upright position for
at least two hours before first use.
C-Shaped Buckle Installation
1.
Align the c-shaped buckles rotary hole with
the rotation shaft and slide fully onto the
rotation shaft.
2.
Rotate the c-shaped buckle counterclockwise
until it locks over the snap joint.
Exhaust Hose Short Connector Installation
1.
Align the two halves and click firmly together.
2.
Stand the heat exhaust hose upright with the
circular connector at the bottom.
3.
Place the exhaust hose short connector on top
of the heat exhaust hose and push down firmly
so that the neck sits over the heat exhaust hose.
4.
Holding the heat exhaust hose firmly at the
bottom rotate the exhaust hose short connector
counterclockwise locking the three screw
threads onto the heat exhaust hose.
07 | English
Snap joint
Rotation shaft
1
Side view A
1
Side view B
Rotary hole
2
2
3

Publicidad

Tabla de contenido
loading

Tabla de contenido