Ozone Hyperlink V2 Manual De Instrucciones página 17

Tabla de contenido

Publicidad

close the zip
Undo the four velcro retainers and unroll the valve.
push the valve back into the kite.
pack the rest of the isl line into the pocket on the rib
(profile section)
8
11
12
close the leading Edge air intake velcro.
7
repeat process for the other side.
13
9
Open the leading Edge air intake velcro to access
valve.
repeat for all three centre valves on the kite. NOTE: On
sizes 9m/11m/13m the outer valves (nearest the wing tips)
are not changed.
10
14

Publicidad

Tabla de contenido
loading

Tabla de contenido