STEP 3: Connecting the Solid Linkage
1.
Push the flow control handle to the "30" position. Insert the A end of the connect-
ing rod (#34) through the Ø8 flat washer (#12) and into the hole on the gauge level
plate (#46). Secure with a M8 lock nut (#11).
2.
Insert the B end of the connecting rod (#34) through the Ø8 flat washer (#12) and
into the hole on the fixed plate (#13). Secure with M8 lock nut (#11).
3.
Push the control handle to the "0" position. The hole in the bottom of the spreader
should be completely closed. If the flow control handle position and the hole in the
bottom of the hopper does match exactly, loosen the two bottom M6 lock nuts (#9)
and move the gauge level plate until the handle position and the hole in the bottom
of the hopper match. Re-tighten the two M6 lock nuts (#9).
UK
7