CONNECT DECORATIVE FLUE
DUCTED INSTALLATION ONLY
Note: Rooms with 10 or 11 foot ceilings
require fl ue extension model AEIPP9SB,
available from your local dealer. Discard
the fl ues and frame supplied with the
range hood and replace with the fl ues
and frames included in the kit.
1. Fix the duct connector onto the hood using
2 screws (3.9x9.5mm) located in the Hard-
ware Package (Fig.9).
2. Place the upper fl ue and lower fl ue over
the support frame (Fig.10).
3. Mount the support frame/hood assembly to
the ceiling using the (4) previously installed
6x70mm screws. Tighten these screws.
Install (2) additional 6x70mm screws as
shown in the illustration. Make sure all (6)
screws are secure.
4. Use 10" round metal duct to connect the
duct collar on the hood to the ductwork
above (Fig.11).
5. Use duct tape to make all joints secure and
air tight.
6. Tape all openings on top surface of range
hood (Fig.12).
10" ROUND
METAL DUCT
FIG. 11
- 11 -
MOUNTING
SCREWS
3,9x9,5mm
FIG.9
FIG. 10
FIG. 12