Pentair Raychem JBM-100-A Instrucciones De Instalación página 6

Ocultar thumbs Ver también para Raychem JBM-100-A:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

11
13
• Push core sealer
onto the heating
cable to the mark
made in step 6.
Note: Extra force may
be required for larger
cables or at lower
temperatures.
bunch, or crossover.
15
• Trim bus wires and braid.
• Repeat steps 12 through
15 for all heating cables.
1/2 in
(13 mm)
THERMAL MANAGEMENT SOLUTIONS
• Slide strain relief
over heating
cables, down onto
box nut.
• Secure strain
relief by tightening
screws.
Optional: Knock
out drain hole
if installed on
bottom of pipe.
Make sure the bus
wires do not kink,
1/2 in
(13 mm)
EN-RaychemJBM100A100A6-IM-H56344      03/13
12
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult
material safety data sheet vEN0033.
• If needed, re-twist and straighten bus
wires, then insert bus wires into guide
tubes as shown.
Make sure all strands
go into the tubes.
14
• Remove the guide tubes
and dispose of them in a
plastic bag.
• Slip the green/yellow
tube onto the braid. Heat-
shrinking is not required.
16
Finished view of installed
core sealers.
Tubes
6 / 10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Raychem jbm-100-a6

Tabla de contenido