Epson ELPMBPJG Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
Installing to Solid Concrete
1.
Using the ceiling plate (B) as a guide, mark mounting hole
locations (two minimum) on ceiling. (See Figure 4)
IMPORTANT ! :
Ensure that OPPOSITE holes are used in
plate (B).
2.
Drill two (minimum) pilot holes as follows: (See Figure 4)
Toggler AF8: 5/16" x 2-3/4"
Fischer UX10: 3/8" x 2-3/4"
1
Figure 4
3.
Align two mounting holes in ceiling plate with two pilot holes.
WARNING:
Anchors (not provided) must be installed into
structurally sound solid concrete. Installation into hollow
concrete block, mortar, or concrete that exhibits cracking,
spalling, or other defects may result in failure of anchor and
serious personal injury or damage to equipment.
4.
Install two Fischer UX10 or Toggler AF8 concrete anchors
(not included) into pilot holes until flush with mounting
surface. (See Figure 5)
5.
Loosely secure ceiling plate (B) to structure using two
(minimum) 5/16" x 2-3/4" lag bolts (H1). (See Figure 5)
x (2)
4
5
(H1) x 2
Figure 5
NOTE:
Do not tighten ceiling plate (B) against ceiling at this
time to accommodate cable installation.
6.
Route cables through channel in ceiling plate (B). (See
Figure 6)
2
x 2
(B)
(B)
(B)
6
7.
Tighten lag bolts. (See Figure 5)
Installing Fixed Pipe
WARNING:
Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer's responsibility to make sure the combined weight of
all components attached to the ELPMBPJG does not exceed
25 lbs (11.4 kg).
1.
Install 3" fixed pipe (A) into threaded collar of ceiling plate
(B) until tight, with a minimum of four threads engaged. (See
Figure 7)
2.
Secure extension column by one of the following methods:
(See Figure 7)
Install one 5/16" x 1/4" set screw (E1) into threaded
hole in ceiling plate (B), tightening firmly against
column.
OPTIONAL: Using 5/32" security hex key (G2), install
one 5/16" x 1/4" security set screw (E2) into threaded
hole in ceiling plate (B), tightening firmly against
column.
(E2)
2
(E1)
2
(A)
ELPMBPJG
Figure 6
(B)
Figure 7
7

Publicidad

Tabla de contenido
loading

Tabla de contenido