ELPMBPJG
TOOLS REQUIRED FOR INSTALLATION
3/32"-security
5/32"-security
(both included)
HARDWARE REQUIRED FOR CONCRETE INSTALLATION (not included)
•
Fischer UX10 concrete anchors OR Toggler AF8 concrete anchors (Qty. 4)
PARTS
Hardware Bag
A1 (4)
M3x8mm
F1 (1)
5/16" x 1/2"
10-24 x 3/8"
(security)
5
7/32" (wood)
5/16" (concrete - Toggler AF8)
3/8" (concrete - Fischer UX10)
A (1)
[3" fixed pipe]
B (4)
A2 (4)
M4x10mm
M3
F2 (2)
G1 (1)
(security)
3/32"
(security)
1/2"
B (1)
[Ceiling plate]
C (4)
M5x10mm
5/16" x 1/4"
G2 (1)
5/32"
(security)
Installation Instructions
C (1)
[Universal interface
with projector mount]
D (4)
M6x10mm
E1 (1)
H1 (4)
5/16" x 2-3/4"
E2 (1)
5/16" x 1/4"
(security)
H2 (4)
5/16"