All manuals and user guides at all-guides.com
2
Installing the base (cont'd)
STEP
Distinct / Zone Square
2.5
Lift the base. Place cement or wood shims under all legs
Check me!
to support the shower base floor. Lower the shower base
and validate leveling and stability of the base on the
floor. If needed, use additional wood shims or cement.
We recommend that a plumber completes the drain
pipe connection.
2.6
Check me!
If needed use wood shims between the studs and the
fastening flange to maintain the position of the base.
13
11