Levolor Cellular Shades Instalación página 13

Ocultar thumbs Ver también para Cellular Shades:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OUTSIDE MOUNT (OM)
Drywall
Drywall
Anchor
Anchor
STEP 2: INSTALLING THE BRACKETS
IMPORTANT: Use drywall anchors when mounting into drywall (not provided).
IMPORTANT: The rear of the brackets must be flush against a flat mounting surface.
Do NOT mount brackets on curved molding.
Pre-drill screw holes using a
Hold the bracket with the surface marked "Top" facing up line up the pre-drilled
screw holes and the holes in the bracket.
— Note: If using spacer blocks: Stack spacer blocks on the back side of the
installation brackets. See page 15 for additional details.
CAUTION: Do not use more than one spacer block. Using more than one
!
spacer block could cause shade to fall resulting in possible injury.
While holding the bracket in place, secure with screws, 2 screws per bracket.
Repeat for each bracket.
Use a level to confirm all brackets are level.
Bracket
Bracket
Screw
Screw
" drill bit, using pencil marks as a guide.
1
16
INSTALLATION
Corded Lift Control
13

Publicidad

Tabla de contenido
loading

Productos relacionados para Levolor Cellular Shades

Tabla de contenido