Levolor Natural Shades Instalación página 9

Ocultar thumbs Ver también para Natural Shades:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSIDE MOUNT (IM)
INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
• Verify that your window casing has a minimum depth of 1 ½" which allows for
a partially recessed headrail mount. If flush mount (fully recessed mount) is
desired, a minimum mounting depth of 2" is required.
• Position the inside-mount brackets at each end of the headrail.
• Using the notches in the headrail as a guide for bracket placement, mark the
locations of the bracket, making sure they are square and evenly placed from the
window. Only two screws are needed per bracket and they should be placed in
bracket holes diagonally from each other.
Bracket
Bracket
INSTALLATION
Corded Lift Control
9

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Levolor Natural Shades

Tabla de contenido