FOR USE WITH
RAIL KIT 58058
Equipment Required:
Fastener Kit: 116624
Wrenches: 3/4, 7/8, 15/16 & 1-1/8
Drill Bits: 1/8", 1/2", 11/16" & 3/4" Drill
Other Tools: Center Punch, Measuring Tape
Some of the fasteners
shown are supplied
with the rail kit.
Vehicle Forward
Spacer used to fill
gap between bracket
and frame (Not
required on older
models)
13
14
5
5
15
14
Driver side
Plug
frame rail
Figure 1a
Inside driver side
frame rail
3/4" X 2.00" Hex Bolt
Qty. (4)
1
3/4" Hex Nut
Qty. (4)
2
3/4" Flat Washer (Large)
Qty. (6)
3
3/4" Lock Washer
Qty. (4)
4
1/2" Hex Nut
Qty. (14)
5
1/2"-13 X 2.00" Carriage Bolt
Qty. (10)
6
3/4" Pull Wire
Qty. (2)
7
5/8"-11 X 1.75" Button Head Bolt Gr. 8
Qty. (2)
8
5/8" Hex Nut
Qty. (2)
9
1/2 " Pull Wire
Qty. (2)
10
©
2011 Cequent Performance Products
Installation Instructions
CUSTOM QUICK INSTALL
MOUNTING KIT
Chevrolet/GMC 1500/2500/3500
2007 ("New Body Style") & Up – 1500
5'8", 6'6", & 8' Bed Pickup Installation
6
16
12
4
3
5
14
13
10
Sheet 1 of 11
WARNING:
Under no circumstances do we recommend
exceeding the towing vehicle manufacturers recommended vehicle
towing capacity.
6
5
17
6
6
5
17
12
Figure 1
Loosen two flange bolts
Figure 1b
Outside driver side frame rail
1/2" Bolt Leader (not shown)
Qty. (2)
11
Qty. (8)
U-Shape Block
12
1/4" X 1.50" X 2.00" Block (Offset Hole)
Qty. (8)
13
1/2" Lock Washer
Qty. (12)
14
1/2" Flat Washer
Qty. (4)
15
1/2"-13 X 4.50" or 5.50" Carriage Bolt (as needed)
Qty. (4)
16
1/2" Conical Toothed Washer
Qty. (2)
17
5/8" Conical Washer
Qty. (4)
18
5/8" Pull Wire
Qty. (2)
19
50064N
Part Number
50064
Note: For some 1500
7
vehicles with box frame, use
parts 8, 9 and 18 in place of
parts 1, 2, 4, and 5 on the rear
mounting holes only.
Inside of frame
Outside of frame
9
3
Figure 1d
19
Angle
bracket
(included)
1
Plug
(wire not shown for clarity)
Figure 1c
1/4/12
8
18
Rev. D