1.
Do not install mounting rails over plastic bed liners. Plastic bed liners must be cut out of the way to provide metal to metal
contact. Mounting rails may be installed on spray in liners.
2.
Use only bolts, nuts, and washers supplied to install this kit. All bolts are grade 5 and nuts are grade 5 unless otherwise
specified.
3.
These instructions are guidelines only, actual installation is the responsibility of the installer and the owner. Always
measure truck and trailer before installing hitch to be sure that there is clearance at the cab and at the bumper to allow for
turns.
4.
DO NOT INSTALL THIS PRODUCT ON OR ATTEMPT TO TOW WITH A TRUCK WITH A BED THAT IS LESS
THAN 6' LONG UNLESS A SIDEWINDER PINBOX COUPLER HAS BEEN INSTALLED ON THE TRAILER.
1.
Lower and remove spare tire. Remove exhaust heat shield from the underneath the passenger side of the vehicle.
2.
Place one mounting rail in the bed of the vehicle. Center the rail on the floor of the truck bed and use your tape measure to
locate the proper distance from the rail to the to the rear edge of the truck box as illustrated on page 9.
3.
Use a center punch to mark the holes in the rail per the illustration. Move the rail out of the way and drill each position
with a 1/8" drill bit. Note: On the driver's side of the vehicle the gas tank is located below the bed of the vehicle.
When drilling holes through the bed be sure not to damage the fuel tank.
Temporarily position the frame brackets on the sides of the frame and check that the 1/8" drilled holes align with the slots
4.
in the frame brackets. Remove the frame brackets from the vehicle.
Enlarge the 1/8" drilled holes to 9/16" if installing the 58058 rail kit. Enlarge to 11/16" if installing the 30124 rail kit.
5.
Position the frame brackets with the 9/16" holes drilled in step 5 and using the frame brackets as a template, drill 1/2" hole
6.
through the vehicle frame rail and fasten the frame brackets to the vehicle frame rails as shown in Figure 4.
7.
Reposition the mounting rail over the holes in the bed and fasten the mounting rail to the frame brackets using the supplied
carriage bolts. Use the supplied U-shaped blocks between the frame bracket or mounting rails and the truck bed to ensure
metal to metal contact.
8.
Place the unassembled 5
mounting rail with the support arches/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail
tight towards the other mounting rail. Ensure that the mounting rail is centered on the bed of the vehicle. This will position
the rail in the correct location and ensure that the 5
product will be used with the mounting rails then both types should be used at the same time to align the rearward mounting
rail. This will ensure that one product does not compromise the fit of the other.
9.
Repeat installation steps 3, 5 and 7.
10.
Starting with the carriage bolts that fasten the rails the frame bracket, torque all the nuts.
11.
Re-install spare tire.
© 2011
Cequent Performance Products
Installation Instructions
CUSTOM QUICK INSTALL
MOUNTING KIT
Chevrolet/GMC 1500/2500/3500
Optional Drilled Application
th
wheel support arches/slider/goose into the already installed mounting rail. Position the rearward
th
wheel will have a snug fit to the truck. Note: If more than one hitch
Sheet 8 of 11
Part Numbers: