Site Preparation - Kohler TROCADERO POWER LITE Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. SITE PREPARATION

A. INSTALL ELECTRICAL SERVICE
Have a licensed electrician install a properly-grounded,
grounding-type receptacle, protected by a Class A
ground-fault circuit interrupter (GFCI).
The electrician should locate the receptacle 6" (15.2cm)
above the floor-line and 2-3/4" (7cm) to the right of the
center-line of the closet flange. The electrical cord length
of the toilet is 3' (91.4cm).
NOTICE:
Follow all local electrical codes.
B. REMOVE EXISTING TOILET
NOTICE: Carefully inspect new fixture for any
sign of damage before removing existing toilet.
Turn off water supply.
Flush the toilet and sponge out remaining water from tank
and bowl.
Disconnect supply valve and remove old tank and bowl.
Remove old gasket from the floor and closet flange with
a putty knife.
Remove old T-bolts (the T-shaped bolts in the closet
flange) and discard.
DANGER: Risk of hazardous gases. If new
toilet is not installed immediately, temporarily
stuff a rag in the closet flange.
C. ROUGH-IN PLUMBING
Turn off water supply.
Install or relocate supplies and outlets as necessary to
conform to roughing-in dimensions. See Fig. #3 . For
shut-off valve location, see Fig. #4 .
A
1007288-2-
2
GFCI-Protected
Receptacle
6" (15.2cm)
2-3/4"
(7cm)
Fig. #1
Closet Flange
Fig. #2
Kohler Co., Kohler, WI U.S.A.

Publicidad

Tabla de contenido
loading

Tabla de contenido