Prepare The Site - Kohler K-4919 Guia De Instalacion

Ocultar thumbs Ver también para K-4919:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

15-7/8" (403 mm)
23-1/4"
(591 mm)
2" NPT
Tap
6"
(152 mm)
18"
(457 mm)
Wall
Floor
Roughing-In
• Roughing-in dimensions are identical if using an optional 3"
outlet spud.
• The urinal complies with ADA requirements when the rim is
mounted no higher than 17" (432 mm) from the finished floor.

1. Prepare the Site

NOTE: If a pre-existing waste pipe will be used and will result in an
acceptable rim height (refer to the rough-in dimensions), follow the
retrofit installation instructions.
For Retrofit Installations
Turn the water supply line off, remove the existing urinal, then
cap off the water supply line inside the wall.
For New Installations
Install waste pipe as necessary to conform to the roughing-in
dimensions.
Install adequate support framing for the wall hangers as needed.
Kohler Co.
Wall Hangers
17-1/4"
(438 mm)
18" (457 mm) to
Center of Hanger
Slots
24"
(610 mm)
19-1/8" (486 mm)
2" NPT Tap
1/4"
(6 mm)
3
12" (305 mm)
31-7/8"
(810 mm)
6" (152 mm)
Spud Detail
1048746-2-D

Publicidad

Tabla de contenido
loading

Tabla de contenido