Cequent Performance Products 30156 Instrucciones página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Failure to follow all of these instructions may result in death or serious injury
INDEX
1. SYSTEM ASSEMBLY
3. INSTALLATION
5. BEFORE EACH TRIP/LUBRICATION
SYSTEM ASSEMBLY
REQUIRED TOOLS
1 ½" SOCKET AND MATCHING WRENCH (OR CRESENT WRENCH)
RUBBER MALLET
TEE PIN AND BUSHING ASSEMBLY
1. Assemble the four anchor bushings and the 1" jam nuts together (fig 1) and snug-fit (no vertical play in anchor bushing
assembly), then go another quarter turn beyond contact point for proper torque requirement.
2. Once all of the bushings and jam nuts are tight, assemble the tee pin and handle as shown (fig 1). (NOTE) When handles are
in locked position locking tab must protrude through slot in channel.
3. Tighten tee pin until there is metal to metal contact. Once this is accomplished loosen tee pin one-and-a-half rotations.
4. Align hole in tee pin and slot in handle nut, pin with included lynch pin.
5. Repeat steps 2, 3, 4 for remaining anchor bushings.
LYNCH PIN
SLOT IN HANDLE NUT
1" JAM NUT
ANCHOR BUSHING
End Cap Installation
1. Orient end cap as shown (fig 2), with ribs being inserted into
cross tube.
2. Insert end cap until flanged surface contacts edge of tube.
3. Repeat steps 1 and 2 for remaining end caps.
© 2011 Cequent Performance Products, Inc. Made in XXX
WARNING:
P. 2
P. 3
P. 4
TEE PIN
SHEET 2 OF 5
2. SYSTEM ADJUSTMENT
4. REMOVAL
6. LIMITED LIFETIME WARRANTY P. 5
HOLE IN TEE PIN
CROSS TUBE
FIGURE 2
30156N
P. 3
P. 4
LOCKING TAB
HANDLE
CHANNEL
HANDLE IN LOCKED POSITION
FIGURE 1
08-08-11
END CAP
Rev. A

Publicidad

Tabla de contenido
loading

Tabla de contenido