Wall Mount
Tools required
#2 Phillips head screw driver, torque wrench.
N
ote:
Hardware and tools to mount wall plate to wall not
supplied.
1.
Pull the supply wires out of junction box (not supplied)
and through the large hole in the center of the wall
plate.
2.
Secure attachment plate to the wall using four bolts
(not included).
3.
Follow instructions step 3 through 5 from pole mount
arm configuration as shown in (Figure 6).
Mast Arm Mount (Figure 7)
Tools required
1/4" Allen wrench, #2 Phillips head screw driver, torque
wrench, drill and 7/16" drill bit.
1.
Determine wire connection method whether inside the
mast arm or inside a separate junction box. Lead wires
are provided exiting the mast arm for connections.
Refer to wire diagram for power connections. Connect
the supply wires to appropriate luminaire leads as
shown in (Figure 4).
2.
Slip the fixture with attached mast arm assembly over
the customer mounting arm (making sure not to pinch
any supply leads while routing). Make sure the mast
arm is fully seated into the mast arm adapter as it
should bottom out against the adapter.
3.
Secure the mast arm to the mounting arm with the
(3) 3/8-16 x 3/8" set screws. Level the fixture while
tightening the set screws. Torque to 120 in-lbs.
4.
Drill a 7/16" hole through the mast arm and install the
3/8" bolt and nut. Use care when drilling to prevent
wire damage. Torque to 120 in-lbs.
Mast Arm Optional Accessory Wiring
1.
Install the mast arm from steps 2-4.
2.
Fold wire leads tightly towards fixture door when sliding
fixture on to mounting arm. If using fixture supplied
lead, use the wiring steps from the Mast Arm Mount
above or proceed with the following steps 3-7 .
3.
Open fixture door by loosening the (8) Phillips head
screws (or thumb screws if supplied) on the door as
shown in (Figure 8).
4.
Remove wire grommet for fixture wires at the back
of the fixture as shown in (Figure 8). Once removed,
fixture is no longer IP rated.
5.
Insert customer lead wires into fixture through
grommet hole and slide fixture on to the mast arm
adapter. Manage wire routing during this process.
Installation Instructions – Prevail XL / USSL XL
6.
Install the (3) 1/4-20 x 1" screws and tighten to
6(Ft-lbs). Tighten the center screw first as shown in
(Figure 3.) and install the plastic plug over the center
screw. (Figure 3.)
7 .
Tuck wires into the fixture and install fixture door.
Tighten the (8) fixture door screws to 20 in-lbs. (or
tighten door thumb screws).
2.9
[74]
Figure 6.
Level Surface
Figure 7.
COOPER LIGHTING SOLUTIONS
8.0
8.0
[203]
[203]
5.0
[127]
6.0
[152]
Wall Plate
6X8 Plate Size
3.0
3.3
[76]
[84]
O.D.
7 .4
[188]
Mast Arm Pole
(2" Tenon Arm)
3/8" Bolt
Tighten To 72 In-Lbs.
IB500018EN
Installation instructions
7 .0
[178]
ø.44
[11]
Dia. Hole
8.0
7 .0
[203]
[178]
Wire Way
(Center Hole)
4.1
[104]
Set Screws (Torque
To 120 In-Lbs)
3