GreenWorks GN 220 Manual Del Operador página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTION
INSTALLING THE CHUTE-ROTATION BOX (See Figure 3)
• Align the holes in the panel of the chute-rotation box (1) and the switch box (2).
• Put the chute-rotation box screws (3) through the holes.
• Tighten the chute-rotation box screw nuts (4) with a wrench (not included).
3
1
2
4
Fig. 3
13

Publicidad

Tabla de contenido
loading

Tabla de contenido