Assembly, Commissioning; Attaching The Additional Handle; Power Supply; Water Connection - Metabo PWE 11-100 Manual Original

Ocultar thumbs Ver también para PWE 11-100:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
17027032_1210 PWE 11-100.book Seite 15 Montag, 20. Dezember 2010 7:55 07
• Overload protection
• Spindle locking knob
• Carbon brushes

7 Assembly, Commissioning

7.1

Attaching the additional handle

Always work with the additional handle
attached (9)! Fit the additional handle as
shown (see illustration A, page 3).
- Fit locking discs (16) to the left and right of the
gear housing.
- Fit the additional handle (9) on the gear housing.
- Insert the thumb screws (15) to the left and right
of the additional handle (9) and turn gently.
- Adjust the additional handle to the required angle
(9).
- Manually tighten the thumb screws (15) to the left
and right.
7.2

Power supply

Before plugging in, check that the rated
mains voltage and mains frequency, as
stated on the rating label, match with your power
supply.
The machine must only be connected to a
socket that has been properly earthed in
accordance with regulations.
Regularly check the cable and the plug on
the power tool and have them repaired by the
Metabo after sales service team if damaged.
If an extension cord is needed, it must be a three-
core lead with a protective (earth) contactor that is
properly connected to both the plug and the
coupler of the cord.
When working outdoors, only use the correspond-
ingly marked extension cable approved for this
purpose.
Regularly check extension cables and replace if
damaged.
Extension cables must be suitable for the power
rating (see Technical Specifications). If using a roll
of cable, always roll up the cable completely.
7.3
Earth leakage circuit breaker (GFCI)
The machine must only be used with the
GFCI (4) supplied.
Check the GFCI (4) as described before each
machine use.
7
6
RESET
5
TEST
4
- Connect the machine to the power supply.
- Push the RESET button (6). The pilot light (7)
now lights up.
- Push the TEST button (5). The pilot light (7)
should go out.
- Press the RESET (6)again to use the machine.
The machine must not be used if you push
the TEST button (5) and the pilot light (7)
does not go out. Have a qualified electrician check
the machine.
Do not use the ground fault circuit interrupter to
switch the machine on or off.
7.4
Shut-off cock
See illustration b, page 3.
Position A = Shut-off cock (1) closed
Position B = Shut-off cock (1) open
7.5

Water connection

Regularly check that the shut-off cock,
hoses, seals and connection pieces are func-
tioning correctly.
Use only clean tap water. The water pressure
must not exceed 6 bar.
Only use the machine when it properly
connected to the water supply.
Do not allow water within the vicinity of the
machine or close to people in the working
area.
Always position the machine so that no water
can enter the machine or come in contact
with electrical components.
- Ensure that the shut-off cock (1) is closed.
- Ensure that the water tap to the water supply is
closed.
- Fit a water hose (1/2 inch or 13mm ) with a
standard self-locking quick connector to the
connection piece (2) until it locks into place.
- Open the water tap to the water supply.
To remove the hose, close the water tap to
the water supply and then open the shut-off
cock (1) to release the pressure in the hose. When
removing the hose, make sure that no water enters
the machine. Close the shut-off cock (1).
7.6
Fitting/Removing the accessory
Press in the spindle locking knob (11) only
when the spindle is stationary!
ENGLISH
ENG
15

Publicidad

Tabla de contenido
loading

Tabla de contenido