Iassembly Onto The Boiler - Lamborghini Caloreclima 310 PM/M-E Manual Para La Instalacion Y El Mantenimento

Quemadores de gas modulantes
Ocultar thumbs Ver también para 310 PM/M-E:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY ONTO THE BOILER
Before the final locking, it is necessary to check that the draught tube gets some centimeters into the chamber
beyond the tube nest.
UK
Legend
1 Sliding flange
2 Insulating cord
3 Insulating gasket
4 Boiler plate
The burner is fastened through the
supplied flange (or semiflange),
sliding over the draught tube,
thereby interposing an adequate
insulating gasket between itself and
the boiler plate and the insulating
cord around the conveying pipe
between the boiler plate and the
flange.
Model
310 PM/M-E
430 PM/M-E
0÷5 cm
34
F
G
H
M16
270
332
M16
320
380÷440
0÷5 cm
Reverse flame
Direct flame
M

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

430 pm/m-e

Tabla de contenido