Kohler K-1647 Guia De Instalacion página 5

Kit de control de vapor con sistema de autolimpieza
Ocultar thumbs Ver también para K-1647:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Prepare the Site
Single Steam Head Installations
NOTICE: The steam head must be installed at least 6" (15.2 cm) from the floor in an area where contact
with occupants is unlikely.
NOTICE: Provide clearance between the back wall and the elbow. The elbow should not contact the back
wall.
NOTE: The edge of the hole should be at least 1" (2.5 cm) away from all wall studs.
Drill a 2-1/2" (6.4 cm) diameter hole in the wall at the desired steam head location.
NOTE: For all the connections, use thread sealant tape and do not overtighten the fittings.
Install a 1/2" NPT connection on the end of the steam housing assembly.
Secure the connection to the framing whenever possible.
NOTE: The steam generator(s) will not operate without water and a connected user interface control.
Kohler Co.
4-1/2" (11.4 cm)
Min
Provide clearance
from wall.
6" (15.2 cm) from Floor
1" (2.5 cm) Min
Wall Stud
2-1/2" (6.4 cm)
5
Custom Shower
Applications
1045320-2-E

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1698

Tabla de contenido