Pentair Berkeley BK4875 Manual Del Usuario
Pentair Berkeley BK4875 Manual Del Usuario

Pentair Berkeley BK4875 Manual Del Usuario

Paquete de eyector de primera calidad para pozo poco profundo

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Description
Corrosion resistant shallow well ejector package (Model BK4875)
includes a plastic shallow well ejector, necessary mounting
hardware, and an assortment of venturis and nozzles to suit your
pump model. For use with Berkeley Pump Models 3PL, 5PL, 7PL,
10PL, 10PLS11C and 15PLS11C (See Page 7 for Performance).
General safety information
Follow safety instructions in your pump owner's manual.
Be sUre pump is turned off and all pressure is re leased
before installing shallow well ejector.
california proposition 65 Warning
This product and related accessories contain
chemicals known to the State of California to cause cancer,
birth defects or other reproductive harm.
taBle i: VentUri / nozzle sizinG
pump
model
number
3PL
5PL
7PL, 10PLS11C
10PL, 15PLS11C
figure 1
figure 2
293 WRIGHT STREET, DELAVAN, WI 53115 WWW.BERKELEYPUMPS.COM
PH: 888-782-7483
© 2013 Pentair, Ltd. All Rights Reserved.
nozzle
Venturi
number
#51
N32P-72
#51
N32P-63
#54
N32P-64
#51
N32P-65
2556 0796
2557 0796
InstallatIon, operatIon & parts Manual
Premium Shallow Well
DisassemBly
Refer to Figure 5 for part description and part list.
1.
Remove the 4 screws that fasten the insert assembly into
ejector body (See Figure 1).
2.
Unscrew the venturi from the ejector body insert (See Figure
2).
3.
Use 5/8" deepwell socket to gently unscrew nozzle from ejector
body insert (See Figure 2).
4.
Select the correct nozzle and venturi from Table I.
5.
Reassemble as follows.
assemBly
1.
Select nozzle and venturi according to Table I.
2.
Thread nozzle into ejector body insert (See Figure 2). Use 5/8"
socket to seat nozzle. Do not overtighten.
3.
Install small O-Ring in groove on venturi (See Figure 2). Thread
venturi into ejector body insert (See Figure 1) hand tight.
4.
Install O-ring in groove on end of ejector body (See Figure 1).
Thread check valve onto ejector body (See Figure 1) hand
tight. Be sure O-Ring is seated in groove.
5.
Install gasket on step in ejector body; install ejector body insert
in ejector body (be sure it seats) with D-shaped opening DOWN
(toward AVC plug) and venturi UP (See Figure 1).
6.
Use four screws to mount insert assembly in ejector body
(See Figure 1). Be sure insert assembly is seated and all four
screws are well started before tightening any screw. Do not
overtighten.
note: When insert assembly is correctly installed and ejector body
is right side up, AVC port will be on bottom of ejector body and
molded-in part number on insert (N40-39P) will be at 9:00 o'clock
position as you look into ejector body.
installation
1.
Loosen stainless steel clamp (Figure 5, Ref. No. 2) until it fits
over ejector body flange.
2.
Place O-ring in circular groove on face of pump flange (See
Figure 3).
figure 3
Model BK4875
Ejector Package
1199 0794 NF
BE549 (Rev. 02/25/13)

Publicidad

Tabla de contenido
loading

Resumen de contenidos para Pentair Berkeley BK4875

  • Página 1 Place O-ring in circular groove on face of pump flange (See Figure 3). 2556 0796 figure 1 figure 3 1199 0794 NF figure 2 2557 0796 293 WRIGHT STREET, DELAVAN, WI 53115 WWW.BERKELEYPUMPS.COM PH: 888-782-7483 BE549 (Rev. 02/25/13) © 2013 Pentair, Ltd. All Rights Reserved.
  • Página 2: Replacement Parts List

    3. Mount ejector assembly on pump body with venturi inserted into top (1-1/4” NPT) port on pump face. AVC port on ejector body should be on BOTTOM of ejector. 4. Align lugs on ejector body with slots on pump flange. 5.
  • Página 3 Mettre le joint torique dans la gorge circulaire pratiquée dans la surface de la bride de la pompe (voir la Figure 3). figure 2 2557 0796 figure 3 1199 0794 NF 293 WRIGHT STREET, DELAVAN, WI 53115 WWW.BERKELEYPUMPS.COM PH: 888-782-7483 BE549 (Rév. 25/02/13) © 2013 Pentair, Ltd. All Rights Reserved.
  • Página 4: Liste Des Pièces De Rechange

    Monter l’éjecteur sur le corps de la pompe, le venturi étant introduit dans l’orifice supérieur (de 1 1/4 pouce NPT) à la surface de la pompe. L’orifice du contrôleur d’air du corps de l’éjecteur doit être à la partie INFÉRIEURE de l’éjecteur. Aligner les pattes du corps de l’éjecteur avec les encoches de la bride de la pompe.
  • Página 5: Paquete De Eyector De Primera Calidad Para Pozo Poco Profundo

    Ponga una anillo-O en la ranura circular ubicada en la cara de la brida de la bomba (Ver Figura 3). figura 2 2557 0796 figura 3 1199 0794 NF 293 WRIGHT STREET, DELAVAN, WI 53115 WWW.BERKELEYPUMPS.COM PH: 888-782-7483 BE549 (Rev. 02/25/13) © 2013 Pentair, Ltd. All Rights Reserved.
  • Página 6 Instale el conjunto de eyector en el cuerpo de la bomba con el venturi instalado en el orificio superior (11⁄4” NPT) ubicado en la cara de la bomba. El orificio de CVA del cuerpo del eyector debe estar en la parte de ABAJO del eyector. Alinee las orejas del cuerpo del eyector con las muescas de la brida de la bomba.
  • Página 7 performance model 3pl model 5pl pressure in psi pressure in psi feet to Water Gpm with n32p-72 Venturi and #51 nozzle Gpm with n32p-63 Venturi and #51 nozzle 16.2 15.8 15.3 14.2 14.0 13.8 – 12.2 12.0 11.8 – – –...
  • Página 8 Limited Warranty BerKeleY warrants to the original consumer purchaser (“purchaser” or “You”) of the products listed below, that they will be free from defects in material and workmanship for the Warranty period shown below. Product Warranty Period Water Systems: whichever occurs first: Water systems products —...

Tabla de contenido