Before You Begin - Cisco 350 Serie Guia De Inicio Rapido

Ocultar thumbs Ver también para 350 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
Welcome
Thank you for choosing the Cisco 350 Series and the Cisco 350XG Series
Managed Switches. The switches are designed to be operational right out-
of-the-box as standard layer 2 and 3 switches. Using the default
configuration, your switch forwards packets between the connecting
devices after power up.
This guide familiarizes you with the switch layout and describes how to
deploy the switch in your network. For additional information, see
www.cisco.com/go/350switches.
Package Contents
• Your Cisco 350 Series or Cisco 350XG Series Managed Switch
• Power Cord
• Rack-Mount Kit and Rubber Feet
• Wall Mounting Package for SG350-10, SG350-10P, or SG350-10MP
• DB-9 to RJ45 Serial Cable
• This Quick Start Guide
• Pointer Card with China RoHS
• Technical Support Contacts
• EU Directives 1999/5/EC Compliance Information (for EU SKU only)

Before You Begin

1
Before you begin the installation, make sure that you have the following:
• RJ-45 Ethernet cables for connecting network devices. A category 6a
and higher cable is required for 10G ports; a category 5e and higher
cable is required for all other ports.
• Console cable for using the console port to manage your switch.
• Tools for installing the hardware. The rack-mount kit packed with the
switch contains four rubber feet for desktop placement, and two
brackets and twelve screws for rack-mounting. If the supplied screws
are lost, use replacement screws in the following size:
Diameter of the screw head: 6.9 mm
Length of face of screw head to base of screw: 5.9 mm
Shaft diameter: 3.94 mm
2
Cisco 350 Series and the Cisco 350XG Series Managed Switches

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

350xg serie

Tabla de contenido