1
1
[08]
OPT
OPT
3
[08]
6
[09]
2
[16]
[17]
1.
EFAB: Attach pillars [09] to the tube assembly [08] using the small
head bolt [15]. Tighten with the allen key [18].
2.
Attach feet [13].
- OR -
3.
Attach carpet spikes [17] and nut [16].
[15]
[13]
[18]
[08]
(6901-002099 <01>)