Burner Start-Up Cycle; Maintenance - Riello RG3F Instrucciones De Instalación, Montaje Y Funcionamiento

Quemadores de gasóleo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65

4.6 BURNER START-UP CYCLE

Normal
Thermostat
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
C
Lock out is indicated by a lamp on the control box (3, fig. 1, page 1).
5.

MAINTENANCE

The burner requires periodic maintenance carried out by a qualified and authorised technician in conform-
ity with legislation and local standards.
Maintenance is essential for the reliability of the burner, avoiding the excessive consumption of fuel and
consequent pollution.
Before carrying out any cleaning or control always first switch off the electrical supply to the burner
acting on the main switch of the system.
THE BASIC CHECKS ARE:
Check that there are not obstructions or dents in the supply or return oil pipes.
Clean the filter in the oil suction line and in the pump.
Clean the photoresistance, (7, fig. 1, page 1).
Check for correct fuel consumption.
Replace the nozzle (fig. 11, page 8) and check the correct position of electrodes (fig. 12, page 9).
Clean the combustion head in the fuel exit area, on the diffuser disc.
Leave the burner working without interruptions for 10 min. and set rightly all the components stated in
this manual.
Then carry out a combustion check verifying:
Smoke temperature at the chimney;
Content of CO
( % );
2
Content of CO (ppm);
Smoke value according to opacity smokes index according to Bacharach scale.
20058598
~
12s
Lock-out due to failure to light
~
12s
10
GB
C
5 s
D5029

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

200585872005858820058589200979052009790820097909

Tabla de contenido