Air Purge; Evacuating - Toshiba RAS-10 Manual Del Usuario

Ocultar thumbs Ver también para RAS-10:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
• Tightening torque of fl are pipe connections
The operating pressure of R32 is
higher than that of R22 (approx.
1.6 times). It is therefore necessary
to fi rmly tighten the fl are pipe
connecting sections (which connect
the indoor and outdoor units) up to the
specifi ed tightening torque. Incorrect
connections may cause not only a
gas leakage, but also damage to the
refrigeration cycle.

Evacuating

After the piping has been connected to the indoor unit, you can perform the
air purge together at once.

AIR PURGE

Evacuate the air in the connecting pipes and in the indoor unit using a
vacuum pump. Do not use the refrigerant in the outdoor unit. For details,
see the manual of the vacuum pump.
Using a vacuum pump
Be sure to use a vacuum pump with counter-fl ow prevention function so that
inside oil of the pump does not fl ow backward into pipes of the air conditioner
when the pump stops.
(If oil inside of the vacuum pump enters the air conditioner, which use R32,
refrigeration cycle trouble may result.)
1. Connect the charge hose from the manifold valve to the service port of the
packed valve at gas side.
2. Connect the charge hose to the port of the vacuum pump.
3. Open fully the low pressure side handle of the gauge manifold valve.
4. Operate the vacuum pump to start evacuating. Perform evacuating for
about 15 minutes if the piping length is 20 meters. (15 minutes for 20 meters)
(assuming a pump capacity of 27 liters per minute) Then confi rm that the
compound pressure gauge reading is –101 kPa (–76 cmHg).
5. Close the low pressure side valve handle of the gauge manifold valve.
6. Open fully the valve stem of the packed valves (both gas and liquid sides).
7. Remove the charging hose from the service port.
8. Securely tighten the caps on the packed valves.
Compound pressure gauge
–101 kPa
(–76 cmHg)
Handle Lo
Charge hose
Connecting pipe
Service port (Valve core (Setting pin))
Packed valve at liquid side
01_1118350131-EN.indd 11
01_1118350131-EN.indd 11
Flare at
indoor unit side
Flare at
outdoor unit side
Pressure gauge
Manifold valve
Handle Hi
(Keep full closed)
Charge hose
Vacuum pump adapter for
counter-fl ow prevention
Vacuum
pump
Packed valve at gas side
CAUTION
• KEEP IMPORTANT 5 POINTS FOR PIPING WORK.
(1) Take away dust and moisture (inside of the connecting pipes).
(2) Tighten the connections (between pipes and unit).
(3) Evacuate the air in the connecting pipes using a VACUUM PUMP.
(4) Check gas leak (connected points).
(5) Be sure to fully open the packed valves before operation.
Packed valve handling precautions
• Open the valve stem all the way out, but do not try to open it beyond the
stopper.
Pipe size of Packed Valve
12.70 mm and smallers
15.88 mm
• Securely tighten the valve cap with torque in the following table:
Cap
Cap Size (H)
H17 - H19
Valve Rod Cap
H22 - H30
Service Port Cap
Service Port Cap
Valve Rod Cap
11
Size of Hexagon wrench
A = 4 mm
A = 5 mm
Torque
14~18 N·m
(1.4 to 1.8 kgf·m)
33~42 N·m
(3.3 to 4.2 kgf·m)
8~12 N·m
H14
(0.8 to 1.2 kgf·m)
14~18 N·m
H17
(1.4 to 1.8 kgf·m)
Hexagon wrench
is required.
A
H
2/10/2560 BE 10:06 AM
2/10/2560 BE 10:06 AM
EN
ES
FR
IT
DE
PT
PL
CZ
RU
CR
HU
TR
NL
GR
SV
FI
NO
DK
RO
BG
EE
LV
SK
SI

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ras-1316pkvsg-e16pavsg-e

Tabla de contenido