Prepare The Site - Kohler K-332 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

72" (182.9 cm)
to Floor, Typical

1. Prepare the Site

IMPORTANT! Secure the piping to the framing.
Install or relocate the water supplies as necessary.
A typical bath and shower installation is plumbed using 1/2"
copper tubing and adapters.
Use thread sealant on all threaded connections.
Temporarily install 1/2" nipples to the bath and shower elbows,
extending at least 2" (5.1 cm) beyond the finished wall.
Turn on the water supply and check for leaks.
Complete the finished wall.
Kohler Co.
Shower Ell
Temporary
Nipple
1/2" Piping
1/2" Male
Adapter
Spout Outlet
3
112807-2-BB

Publicidad

Tabla de contenido
loading

Tabla de contenido