TE-Series PRO Channels
Corridor Installation Instructions
MODEL: 1TEC1C1RC8SIL
INSTALLATION:
1) Prep electrical feed as necessary.
2) Fabricate/Construct recess for the channel to
reside.
3) Assemble tape light as typically instructed.
Install the tape light in the channel.
4) Snap in lens or slide in wide corridor lens.
5) Insert spring clips on both sides. Space spring
clips 8-12 inches apart maximum.
6) Fasten end caps with provided screws.
Note: Consider electrical connections before
closing the endcaps.
7) Retract the spring clips and insert into recess.
Note: Optional: Mud over flange with
appropriate material for your installation.
Please see next page for CAUTIONS, WARNINGS, and FCC Information
IS-TE-Series PRO Channels Corridor Installation-US
We're here to help
MODEL: 1TEC1C2RC8SIL
INSTALLATION:
1) Prep electrical feed as necessary.
2) Fabricate/Construct recess for the channel to
reside.
3) Assemble tape light as typically instructed.
Install the tape light in the channel.
4) Snap in lens.
5) Fasten end caps with provided screws.
Note: Consider electrical connections before
closing the endcaps.
6) Mount with Construction adhesive.
Note: Optional: Mud over ceiling flange with
appropriate material for your installation.
866-558-5706
Hrs: M-F 9am to 5pm EST