Daikin Altherma 3R Manual Del Usuario página 12

Ocultar thumbs Ver también para Altherma 3R:
Tabla de contenido

Publicidad

5 Piping installation
b
d
d
2 Choose a piping route (a, b, c or d).
a
d
a
Front
b
Side
c
Rear
d
Bottom
INFORMATION
a
b
b
▪ Remove the knockout hole (a) in the bottom plate or
cover plate by tapping on the attachment points with a
flat head screwdriver and a hammer.
▪ Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing and underlying piping.
▪ After making the knockout holes, we recommend to
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
3 Do the following:
▪ Connect the liquid pipe (a) to the liquid stop valve.
▪ Connect the gas pipe (b) to the gas stop valve.
Installation manual
12
a
c
c
b
b
a
b
b
a
4 Do the following:
▪ Insulate the liquid piping (a) and the gas piping (b).
▪ Wind heat insulation around the curves, and then cover it
with vinyl tape (c).
▪ Make sure the field piping does not touch any compressor
components.
▪ Seal the insulation ends (sealant etc.) (d).
▪ Wrap the field piping with vinyl tape (e) to protect it against
sharp edges
f
d
a
b
e
c
5 If the outdoor unit is installed above the indoor unit, cover the
stop valves (f, see above) with sealing material to prevent
condensed water on the stop valves from moving to the indoor
unit.
NOTICE
Any exposed piping might cause condensation.
6 Reattach the service cover and the piping intake plate.
7 Seal all gaps (example: a) to prevent snow and small animals
from entering the system.
a
NOTICE
Do not block the air vents. This could affect air circulation
inside the unit.
ERLA11~16DAV3+W1
Daikin Altherma 3 R
4P643598-1 – 2021.09

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Erla11dav3Erla14dav3Erla16dav3Erla11daw1Erla14daw1Erla16daw1

Tabla de contenido